Assisted NC businesses in winning 2,232 contracts valued up to $24.62 billion

U.S. Army Reserve Center in Asheville, NC

read more ›

Project Number: W912QR24R0011

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: NC

Location: Asheville

Projected Years: 2024-2026. The Contract Duration is estimated at seven hundred twenty (720) calendar days from Administrative Notice to Proceed.

Quarters: Q2 2024

Naics: 236220

Procurement Method:

Budget:$10M to

Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, Palm Beach County, Florida

read more ›

Project Number: W912EP24R0002

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: FL

Location: Palm Beach

Projected Years: 2024-2034. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.

Quarters: Q3 2024

Naics: 237990

Procurement Method:

Budget:$500M to

Restrooms, Breakrooms, O2 Generator Shelters (Upper and Lower Dissolved Oxygen Plants)

read more ›

Project Number: W912HN24B5000

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: GA

Location:

Projected Years: 2024

Quarters: Q2 2024

Naics: 237990

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:$1M to $5M

FY24 BRUNSWICK INNER HARBOR MAINTENANCE DREDGING

read more ›

Project Number: W912HN24S5002

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: GA

Location: Brunswick

Projected Years: 2024-2025. The Period of Performance is anticipated to be 120 days After Notice to Proceed.

Quarters: Q2 2024

Naics: 237990

Procurement Method:

Budget:$1M to $5M

Building 34 Chiller Replacement

read more ›

Project Number: W9123624B2010

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: VA

Location: Richmond

Projected Years: 2024. The contract completion date will be 180 calendar days after notice to proceed.

Quarters: Q2 2024

Naics: 236220

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:$1M to $5M

Arlington National Cemetery – Sanitary Sewer Line Repair

read more ›

Project Number: W9123624B2011

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: VA

Location: Arlington

Projected Years: 2024-2025. The construction completion date will be approximately 410 calendar days from the issuance of Notice to Proceed (NTP).

Quarters: Q2 2024

Naics: 237110

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:$1M to $5M

DSCR North Gate Renovation (Construction)

read more ›

Project Number: W9123624B4004

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: VA

Location: Richmond

Projected Years: 2024

Quarters: Q2 2024

Naics: 236210

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:$1M to $5M

Fuel System Maintenance Dock (Hangar)

read more ›

Project Number: W9123624R2005

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: VA

Location: Langley AFB

Projected Years: 2024-2026. The contract completion date will be 720 calendar days after notice to proceed.

Quarters: Q2 2024

Naics: 236220

Procurement Method:

Budget:$10M to $25M

St. Lucie Inlet Maintenance Dredging 7-Foot Project, Entrance Channel and Impoundment Basin Martin County, Florida

read more ›

Project Number: W912EP24B0001

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: FL

Location: Jacksonville

Projected Years: 2024. The project will have an estimated period of performance of 160 calendar days after issuance of Notice to Proceed (NTP).

Quarters: Q2 2024

Naics: 237990

Procurement Method:

Budget:$5M to $10M

Plating and Metal Finishing Services

read more ›

Project Number: 70Z03824IE0000003

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: U.S. COAST GUARD

Sub-Organization: AVIATION LOGISTICS CENTER (ALC)(00038)

State: NC

Location: Elizabeth City

Projected Years: 2024

Quarters: Q2 2024

Naics: 332813

Procurement Method:

Budget:TBD to TBD

CGC VIGOROUS FY24 AA

read more ›

Project Number: 70Z080-24-S-CGCVIGOROUS

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: U.S. COAST GUARD

Sub-Organization: SFLC PROCUREMENT BRANCH 1(00080)

State: VA

Location: Virginia Beach

Projected Years: 12 APR 2024 – 18 MAY 2024 

Quarters: Q1 2025

Naics: 336611

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:TBD to TBD

U.S. Army Reserve Center in Asheville, NC

read more ›

Project Number: W912QR24R0011

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: NC

Location: Asheville

Projected Years: 2024-2026. The Contract Duration is estimated at seven hundred twenty (720) calendar days from Administrative Notice to Proceed.

Quarters: Q2 2024

Naics: 236220

Procurement Method:

Budget:$10M to

CGC MOBILE BAY AND BARGE DOCKSIDE REPAIRS

read more ›

Project Number: CGC-MOBILE-BAY-AND-BARGE-DOCKSIDE-REPAIRS

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: U.S. COAST GUARD

Sub-Organization: SFLC PROCUREMENT BRANCH 1(00080)

State: WI

Location: Sturgeon Bay

Projected Years:  August 19, 2024 thru September 22, 2024.  (Subject to change at the discretion of the Government).

Quarters: Q2 2024

Naics: 336611

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:TBD to TBD

Deliver ALCO 251 Engine Parts Kits: Fairbanks Morse Defense, LLC, part number 16612811 (NSN 2815-01-700-3135)

read more ›

Project Number: 70Z08522D42114B00

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: U.S. COAST GUARD

Sub-Organization: SFLC PROCUREMENT BRANCH 2(00085)

State: VA

Location: Norfolk

Projected Years: 2024

Quarters: Q2 2024

Naics: 333618

Procurement Method:

Budget:TBD to TBD

175′ WLM DYNAMIC POSITIONING SYSTEMS

read more ›

Project Number: 70Z04024Q62401B00

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: U.S. COAST GUARD

Sub-Organization: SFLC PROCUREMENT BRANCH 3(00040)

State:

Location: USA

Projected Years: The Government will award one (1) fixed-price Requirements contract, consisting of one (1) 12-month base period and nine (9) 12-month option periods as a result of this solicitation.

Quarters: Q2 2024

Naics: 334511

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:TBD to TBD

Reconfigure and Modernize the 1600-member LTC Luis E. Martinez Army Reserve Center (ARC) in Perrine, FL

read more ›

Project Number: W912QR24R0010

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: FL

Location: Miami

Projected Years: 2024

Quarters: Q2 2024

Naics: 236220

Procurement Method:

Budget:$25M to $100M

EAST ST. LOUIS, ILLINOIS, FLOOD PROTECTION PROJECT, BID PACKAGE 14B

read more ›

Project Number: W912P924R0016

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: IL

Location:

Projected Years: 2024

Quarters: Q2 2024

Naics: 237990

Procurement Method:

Budget:$1M to $5M

Single Award Task Order (SATOC) for Matagorda Ship Channel – Peninsula to Point Comfort, Matagorda, TX Pipeline Dredging

read more ›

Project Number: W912HY24S0Z0P

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: TX

Location: Matagorda

Projected Years: August 2024. Completion time for the seed Task Order project is 120 calendar days for Schedule 1 and 140 calendar days for Option 1.

Quarters: Q2 2024

Naics: 237990

Procurement Method:

Budget:TBD to TBD

Construction Services for Maintenance Dredging of the Josias River at Perkins Cove, Ogunquit, Maine Federal Navigation Project and Narraguagus River Federal Navigation Project in Milbridge, Maine.

read more ›

Project Number: W912WJ24X0025

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: ME

Location: Ogunquit

Projected Years: 2024-2025. The anticipated allowable dredging window is between November 1 and April 15 to avoid impacts to spawning shellfish/benthic resources, and interactions with endangered species of fish.

Quarters: Q2 2024

Naics: 237990

Procurement Method:

Budget:$1M to $5M

Nobles Branch Sump Improvements

read more ›

Project Number: W9126G24T0031

NCMBC Representative: Donna Walton – waltond@ncmbc.us

Organization: DEPT OF THE ARMY

Sub-Organization: USACE

State: TX

Location: Dallas

Projected Years: 2024-2026. Period of Performance: Approximately 588 Calendar Days.

Quarters: Q1 2024

Naics: 237990

Procurement Method: Total Small Business Set-Aside (FAR 19.5)

Budget:$5M to $10M

  • Filter NCMBC Future Opps

    • Select NCMBC Representative(s)

    • Select Organization(s)

    • Select Sub-Organization(s)

    • Select State(s)

    • Select Location(s)

    • Select Projected Year(s)

    • Quarter

    • Select Industry


  • The NC Military Business Center, the NC Community College System, and the State of North Carolina do not officially endorse events. These items are posted strictly for the information and convenience of NCMBC customers.

    website by Biz Tools One